Solar Project Execution

E*Gen handles all aspects of solar project execution with a disciplined multi-phased approach. We ensure all work is completed within the proposed timeframe and budget while exceeding industry standards for quality and safety.

E*Gen ensures all work is completed within the proposed timeframe and budget while exceeding industry standards for quality and safety.

Phase 1: Education

The first step in any project is to make sure the partner understands our services, and the available opportunities. Most important is that we understand and can meet YOUR needs and expectations!

Phase 2: Site Evaluation and Approval

E*Gen technicians analyze sites and verify electric and structural loads. The analysis includes ensuring site suitability for solar modules, electrical service construction, building integration, and distribution equipment.

Each project is evaluated on a case-by-case basis. We use sophisticated tools and technology to determine ideal locations for solar systems ensuring optimal year round performance. During our evaluation we examine:

  • possible shading concerns
  • structural constraints
  • electrical connections
  • metering options
  • permitting requirements

Phase 3: Pre-Construction Planning

After the evaluation stage, we design the ideal solar system for your circumstances utilizing the world’s finest solar products along with local content, ensuring the best ROI and reliability. Structural, mechanical, and electrical engineering is done at this point to ensure your system can be installed and operated for 20 years plus.

E*Gen engineers draft construction plans and an installation timeline. We handle all equipment orders, logistics and arrange project financing if required. We also secure all necessary permits and work with your local utility on interconnection and feed-in-tariff contracts.

E*Gen design team employs engineering best practices to ensure its solar generating systems meet or exceed structural and electrical requirements, as well as the specific requirements of IEEE, CSA, UL and NEC.

Phase 4: Final Design and Installation

E*Gen engineering and contracting teams prepare the job site and install the solar array, power conditioning equipment, wiring, data acquisition system, and communications equipment. The engineering guidelines include quality and design standards that ensure peak lifetime system performance.

Solar Project ExecutionE*Gen Power employs only the most qualified trained PV installers with experience in construction, roofing, electrical and solar energy systems. Everything is done right the first time, which eliminates call backs or reliability issues. Our installation practices are second to none and will stand the test of time.

Phase 5: Inspection and Commissioning

E*Gen performs a complete system inspection and performance evaluation. All relevant parties also inspect the system for a 360 degree certification process, including building owners, facility staff, local building authorities, Electrical Safety Authority and the local utility.

Phase 6: Ongoing monitoring, maintenance and revenue

E*Gen ensures the system is performing to its optimal form at all times, ensuring a long-term maximized revenue stream for the system owner.

E*Gen Power systems are monitored every day through our online software. At any point of the day, we can determine system output and performance. This information is available to the customer as well, giving you certainty that your system is performing to your satisfaction.

E*Gen also provides a comprehensive and robust maintenance program, which provides regular inspections of your Solar system to ensure optimal system efficiencies and long term performance.